(VID-P2-0028)
Simulating your PLC project before entering the field to deploy, can save you valuable time and reduce errors. Productivity PLC simulator can help you greatly in this.
With the Productivity PLC simulator, you can test various aspects of your plc program without the need for PLC hardware or field devices.
This Productivity Simulator works for Productivity 1000, Productivity 2000, and Productivity 3000.
When connecting your C-more panel to the Productivity PLC Simulator on the PC, the IP address of the Productivity driver in your C-more setup but be that of your PC.
This topic is covered in Help topic P308.
Voted #1 mid-sized employer in Atlanta
Check out our
job openings