In this video we’ll use the tag integration
method to bring Do-more tags into a point of view project so we can control and monitor
the Do-more based system. Let’s start a new project. Point of View button, New. I have a folder on My C drive I’m using
for these demo projects – but you can put yours anywhere you want. Looks like I have two licenses available,
we’ll use the 1000 tag license for this project. We’re going to use a small screen so it
is easy for us to see in this video. You would want to choose the screen size that
works best for you. Now beware, you need to pick this wisely – it
is NOT easy to change later … Great we have a new empty project that we
can use to talk to a Do-more series controller. Let’s flip over to a Do-more project. Here’s a simple little project that will
allow Point of View to control this output coil by writing to this Motor_Enable tag,
display the status of that motor coil with an indicator, set a numeric value to drive
this coil, and display the scaled version of an analog input. All of the basic kinds of operations you would
normally want to do. All we do is export those tags to a file. When talking to Point of View, make sure you
select the C-more version of the CSV file. You can put it where ever you want, but you
will save yourself some major headaches if you put it in your Point of View project folder. That’s because every time you start the
development software, Point of View re-loads the tags from this file. If you develop the app on your computer and
let’s say you put the tag file in your documents folder. Then you send the app to someone else to work
on. Well, Point of View won’t be able to find
the tags on his PC because it will be trying to find YOUR documents folder on your PC. And when it doesn’t find the tags, it DELETES
THEM and now you have to start over. So we’re going to avoid those headaches
and drop this CSV file into the point of view project folder, and we’ll call it Do-more_Tags. Click Save and we are done. Back in Point of View under the Project tab
we want to communicate with a PLC so we click the communication button. And in this Tag Integration section click
on ADD. This is for a Do-more Series controller so
I’ll select that one. This Name field will be the name of the folder
the tags are stored under in Point of View so let’s call this Do-more for the Do-more
controller that these came from. You might want to give it a more descriptive
name like Pump Controller or Turbine Controller – whatever makes sense to you. Click ADD and enter the address of the controller. We need to select the exported tag file which
we put in our project folder. And hit OK. Hit OK again and we’re done! So all we’ve done so far is export the tags
from the Do-more software and then tell Point of View where to find them using this Communications
Dialog. That’s all there is to it. Let’s build a simple app to test it. Right click on screens to insert a new screen
into the project. Give it a name and hit ok. Let’s use a pushbutton to enable the conveyor
motor. Under the graphics tab, symbols, system symbols,
pushbuttons – let’s grab this one, drop it on the screen and double click to bring
up its properties. Let’s change this command tag to the Motor
Control tag from the Do-more Controller. The command tag is the one that will be written
to the Do-more when we push the button. The Do-more tags will be under DEVICES in
that folder we named ‘Do-more’ back when we setup the import in the communications
dialog. We want the nicknames folder and there it
is. Double click on that to select it. We want the same tag to control the look of
the switch so I’ll just copy and paste that here. Let’s add an indicator so we can see if
the Motor is getting enabled. Graphic tab, symbols, pilot lights, and we’ll
double click on this green one. Drop it on the screen. Double click on it and change the pre-assigned
tag to the Motor Tag from the Do-more. Notice that tags we have NOT used yet are
grayed out. Let’s try what we have so far. Before we do that, let’s modify the viewer
so it doesn’t take up the whole screen. Project Tab, Viewer, let’s select the title
bar so we can drag the window around, the usual controls and we DON’T want to start
maximized and we do want to be able to resize the window. Great. Save the screen, give it a name. Run it. Let’s re-size that so we can see it. Toggle the Switch and sure enough the output
on the Controller responds. Perfect. Let’s send a numeric value to the Do-more
to control this coil. Graphics. Text Box. Double click. Browse our tags. Select the Ultrasonic tag. We do want to be able to enter a number into
this text box so make sure this checkbox is checked. And let’s add a Numeric display so we can
monitor this scaled temperature from the Do-more controller. Text Box, Double click. Browse the tags. Select the called Temperature Tag. We’re not entering numbers into this text
box so we’ll un-check this is NOT an input box, so we’ll uncheck this guy. Let’s try that. Save. Run. And sure enough if we enter a value greater
than 75 it appears down on the Do-more and controls this coil. And if I change this analog value on the Do-more,
that appears up here in Point of View. Perfect. Well, you get the idea. To connect Point of View to a Do-more series
controller, just export the tags using the generic C-more option, tell Point of View
where to find them using that communications dialog and then use them just like any other
tag. There are a couple things you need to be aware
of when using Tag Integration with a Do-more controller, so be sure to check out part 3
of this series before using Tag Integration. It’ll save you a lot of time and frustration. If you need any help, please call AutomationDirect’s
Free, Award winning tech support during regular business hours – they will be happy to help. And don’t forget the forums – there are
lots of folks there that love to share their years of experience. Just don’t post any questions directed at